
INTERIOR DIVISIONS · COORDINATED SYSTEMS
Partitions
Precisely coordinated gypsum partitions, wall cladding, cement board, glass and composite systems for resolved interior spaces.
PARTITIONS / SITE DETAILS
Defining spaces.
Detail by detail.
Explore our partition works through 4 views of steel framing, wall junctions, service coordination and installation on site.

Full-height partition framework
Steel studs define the interior layout around the concrete structure.

Stud alignment and junctions
A closer look at tall stud walls and their structural interfaces.

Connected interior spaces
Openings, columns and stud walls establish the relationship between spaces.

Resolving the corners
Intersecting partition runs show the alignment of tracks and vertical studs.
Site photography · Retouched for colour and visual clarity. Select any image to view the complete photograph.
Partitions in progress.
28 additional views of framing, insulation, board lining and finishing.

Insulated partition framework

Perimeter wall insulation

Board lining and insulation

Partition setting out

Doorway and wall junction

Service coordination

Installation review

Corridor partition framing

Framing and blockwork

Overhead track installation

Perimeter partition junction

Interior partition layout

Full-height wall framing

Partition installation access

Coordinated partition runs

Finished wall surfaces

Board fixing and joints

Large-space partition framework

Washroom wall preparation

Wall lining and ceiling joints

Board-lined circulation space

Completed board-lined room

Washroom services and vanity

Moisture-resistant board lining

Partitioned corridor inspection

Double vanity framework

Mixed-board partition finish

Washroom recess and wall finish
OUR SPECIALIST CAPABILITY
Partition systems that define interior space
Precisely coordinated gypsum partitions, wall cladding, cement board, glass and composite systems for resolved interior spaces.
- Specialist systems
- Gypsum partitions, wall cladding, cement board, glass and composite systems
- Our process
- Layout coordination, specialist installation and detailed inspection
CAPABILITY, PROCESS & APPLICATION
Understand the specialist work, how it connects to the complete interior and what to share for a new project enquiry.
Partition systems that define interior space
Arcane coordinates and installs gypsum and drywall partitions, wall cladding, cement board, glass and composite partition systems in Dubai and across the UAE. We work with architects, contractors and specialist project teams to define rooms, circulation routes and connections between interior spaces.
A precisely resolved partition package considers layout, wall build-up, openings, junctions and connections to surrounding ceilings and finishes. The selected system follows the project brief and technical specification.
From layout to coordinated installation
Arcane combines technical coordination, specialist installation and detailed inspection. The brief identifies the wall locations, openings, interfaces and performance requirements, while coordination resolves how each system meets the architecture.
The published capability is a starting point for defining a specialist partition scope. Exact systems, build-ups and performance requirements are agreed for each project.
Partition references in the portfolio
The company profile records partition packages at Burj Binghatti Jacob & Co Residences, District 01 West, Dubai Harbour Residences and Dubai Exhibition Centre.
EMPOWER Headquarters is recorded with glass mat board partitions, while Binghatti Orchid, Binghatti Dusk and J One Tower include wall partition packages. Individual project pages identify the recorded scope and parties.
Planning a coordinated partition package
Share the location, type of space, drawings and required systems. Identify the partition areas, openings and interfaces with ceilings or existing architectural elements.
Use the enquiry form or contact Arcane directly. Systems, quantities, performance requirements, pricing, availability and programme details need project-specific confirmation from the team.
USEFUL INFORMATION
About this expertise
Which partition systems are included?
The published capability includes gypsum partitions, wall cladding, cement board, glass and composite systems. The correct specification and build-up depend on the project requirements.
Which portfolio references include partitions?
The portfolio includes partition work at Dubai Exhibition Centre, EMPOWER Headquarters and several major residential developments in Dubai.
Can the team review a project specification?
Share the drawings, required systems, performance criteria and included areas. The team can confirm the information needed for a project-specific review.
YOUR NEXT SPECIALIST PACKAGE
A clear brief.
A considered start.
Share your project location, the space you have in mind and the specialist work required.





